Files
wehub-resource-sync a0c8464e58
Build Package / build (ubuntu-latest) (push) Failing after 1s
CodeQL / Analyze (python) (push) Failing after 1s
Core Typecheck / core-typecheck (push) Failing after 1s
Linting / lint (push) Failing after 1s
llama-dev tests / test-llama-dev (push) Failing after 1s
Publish Sub-Package to PyPI if Needed / publish_subpackage_if_needed (push) Has been skipped
Sync Docs to Developer Hub / sync-docs (push) Failing after 0s
Build Package / build (windows-latest) (push) Has been cancelled
chore: import upstream snapshot with attribution
2026-07-13 12:26:52 +08:00

20 lines
658 B
YAML

name: "Close stale issues and PRs"
on:
schedule:
- cron: "30 1 * * *"
jobs:
stale:
runs-on: ubuntu-latest
steps:
- uses: actions/stale@v10
with:
# PR configuration
stale-pr-message: "This PR is stale because it has been open 50 days with no activity. Remove stale label or comment or this will be closed in 10 days."
close-pr-message: "This PR was closed because it has been stalled for 10 days with no activity."
days-before-pr-stale: 50
days-before-pr-close: 10
# Disable issue processing
days-before-issue-stale: -1
days-before-issue-close: -1