chore: import upstream snapshot with attribution
This commit is contained in:
@@ -0,0 +1,58 @@
|
||||
/*
|
||||
* QUANTCONNECT.COM - Democratizing Finance, Empowering Individuals.
|
||||
* Lean Algorithmic Trading Engine v2.0. Copyright 2014 QuantConnect Corporation.
|
||||
*
|
||||
* Licensed under the Apache License, Version 2.0 (the "License");
|
||||
* you may not use this file except in compliance with the License.
|
||||
* You may obtain a copy of the License at http://www.apache.org/licenses/LICENSE-2.0
|
||||
*
|
||||
* Unless required by applicable law or agreed to in writing, software
|
||||
* distributed under the License is distributed on an "AS IS" BASIS,
|
||||
* WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied.
|
||||
* See the License for the specific language governing permissions and
|
||||
* limitations under the License.
|
||||
*/
|
||||
|
||||
using System;
|
||||
|
||||
namespace QuantConnect.Report
|
||||
{
|
||||
/// <summary>
|
||||
/// Represents a period of time where the drawdown ranks amongst the top N drawdowns.
|
||||
/// </summary>
|
||||
public class DrawdownPeriod
|
||||
{
|
||||
/// <summary>
|
||||
/// Start of the drawdown period
|
||||
/// </summary>
|
||||
public DateTime Start { get; }
|
||||
|
||||
/// <summary>
|
||||
/// End of the drawdown period
|
||||
/// </summary>
|
||||
public DateTime End { get; }
|
||||
|
||||
/// <summary>
|
||||
/// Loss in percent from peak to trough
|
||||
/// </summary>
|
||||
public double PeakToTrough { get; }
|
||||
|
||||
/// <summary>
|
||||
/// Loss in percent from peak to trough - Alias for <see cref="PeakToTrough"/>
|
||||
/// </summary>
|
||||
public double Drawdown => PeakToTrough;
|
||||
|
||||
/// <summary>
|
||||
/// Creates an instance with the given start, end, and drawdown
|
||||
/// </summary>
|
||||
/// <param name="start">Start of the drawdown period</param>
|
||||
/// <param name="end">End of the drawdown period</param>
|
||||
/// <param name="drawdown">Max drawdown of the period</param>
|
||||
public DrawdownPeriod(DateTime start, DateTime end, double drawdown)
|
||||
{
|
||||
Start = start;
|
||||
End = end;
|
||||
PeakToTrough = drawdown;
|
||||
}
|
||||
}
|
||||
}
|
||||
Reference in New Issue
Block a user