Files
wehub-resource-sync 36b3af2e3d
PR Check / Code Quality: Format (push) Failing after 1s
PR Check / Code Quality: Lint (darwin) (push) Failing after 0s
PR Check / Code Quality: Lint (freebsd) (push) Failing after 1s
PR Check / Code Quality: Lint (windows) (push) Failing after 1s
PR Check / Code Quality: Lint (linux) (push) Failing after 1s
PR Check / Security: Vulnerability Scan (push) Failing after 0s
Update Documentation / update-docs (push) Failing after 2s
PR Check / Code Quality: Vendor (push) Failing after 1s
PR Check / Code Quality: Coverage (push) Failing after 0s
PR Check / Tests: Unit (macos-latest) (push) Has been cancelled
PR Check / Tests: Unit (ubuntu-24.04) (push) Has been cancelled
PR Check / Tests: Unit (ubuntu-24.04-arm) (push) Has been cancelled
PR Check / Tests: Unit (windows-latest) (push) Has been cancelled
chore: import upstream snapshot with attribution
2026-07-13 12:22:06 +08:00

986 B
Raw Permalink Blame History

Description

Briefly describe what this PR does. Mention existing issue number, if applicable.

Type of change

Check all that apply:

  • Bug fix (non-breaking change which fixes an issue)
  • New feature (non-breaking change which adds functionality)
  • Breaking change (may affect existing functionality)
  • This change requires a documentation update

Checklist

  • I have formatted my code using go fmt ./...
  • I have opened this PR against the staging branch
  • I have performed a self-review of my own code
  • I have added helpful comments where needed
  • I have made corresponding changes to the documentation
  • My changes generate no new warnings
  • New and existing unit tests pass locally with my changes

Thank you for your contribution! 🎉

Were excited to review your pull request. Please fill out the details above to help us understand your changes. Dont worry if you cant check every box, just do your best!