Files
wehub-resource-sync 79031da543
Spell checking / Report (Push) (push) Blocked by required conditions
Spell checking / Report (PR) (push) Blocked by required conditions
Spell checking / Check Spelling (push) Has been cancelled
Spell checking / Update PR (push) Has been cancelled
Publish Dev Docs Website / build (push) Failing after 1s
Publish Dev Docs Website / deploy (push) Has been skipped
chore: import upstream snapshot with attribution
2026-07-13 12:16:02 +08:00
..

Specs

All approved specs are inside the Wiki spec section

Spec process

  1. A proposed item is either new or requesting additional design
  2. Spec is written inside the Specs folder and a PR happens with feedback.
  3. Once spec is signed off, we move it into the Wiki spec section.

Thought process behind this

We want a single wholistic for PowerToys. This includes both source code, docs, and specs. At the same time, we want to ensure items have pull requests and feedback. Since the wiki cannot do PR's, we will do the process above.

This process will allow specs to be image rich but not impact the primary repository's size as more items come online.