Brainstorm Sections
This reference describes what makes a great requirements-only unified plan
artifact produced by ce-brainstorm.
It does NOT prescribe how the doc looks on the page — rendering is handled by
the format-specific references (markdown-rendering.md, html-rendering.md).
The outcome
A great brainstorm produces the first version of the same plan artifact that
ce-plan later enriches. It enables three audiences to act:
- The planning agent (
ce-planor a human) produces an implementation plan without inventing user behavior, scope boundaries, or success criteria — the brainstorm answered those. - The reviewer sees the framing choices, distinguishes pinned from open, and catches scope gaps before planning.
- The future reader traces why the proposed thing matters, who it's for, and what success looks like.
Sections earn their place by serving one of these audiences. Omit padding.
Unified plan skeleton contract
New ce-brainstorm outputs live under docs/plans/ and use the unified plan
artifact contract:
- Path:
docs/plans/YYYY-MM-DD-NNN-<type>-<topic>-plan.<md|html>. artifact_contract: ce-unified-plan/v1.artifact_readiness: requirements-only.product_contract_source: ce-brainstorm.executiononly when the brainstorm has enough signal to classify the eventual execution domain. For software features, useexecution: code. For non-code deliverables, follow the universal-brainstorming route instead of pretending the artifact is executable code.
A requirements-only unified plan is kept light and standalone-readable. It includes:
## Goal Capsulewith objective, product authority, and open blockers.## Product Contractcontaining the brainstorm sections below.
Do not emit a ## Goal Launch Block or ## Reader Index: the launch prompt
is skill-emitted at handoff, not a doc section, and the contract carries no
Reader Index — consumers wayfind by scanning headings. It also omits empty
Planning Contract, Implementation Units, Verification Contract, and
Definition of Done sections — empty placeholders make requirements-only docs
look executable and waste downstream tokens. ce-plan adds those sections when
it enriches the same file in place. The next step (planning) is conveyed by the
Phase 4 handoff menu, not by a section in the doc.
Historical docs/brainstorms/*-requirements.* files remain valid legacy
inputs. Do not migrate or rewrite them when creating new artifacts.
Decide whether a doc is warranted at all
Brainstorm dialogue does not always need to produce a durable document. Skip document creation when both hold:
- The user only needs brief alignment — no exploration produced novel scope, framing, or decisions worth preserving in IDed shape.
- Any durable decisions made during the dialogue can flow naturally to
downstream artifacts (
ce-plan, the commit message,docs/solutions/) without a brainstorm doc as an intermediary.
The trigger for creating a doc is when the dialogue surfaced enough structural decisions, scope boundaries, or acceptance criteria that downstream consumers (planner, reviewer, future reader) need them in a durable, IDed form — not just as conversational artifacts.
Stress test: a brainstorm about a tiny bug fix where the user asks "fix
this with a null check or with upstream validation?" and the agent confirms
"upstream validation, here's why" doesn't need a brainstorm doc. The
decision flows to ce-plan (or directly to commit message, or to
docs/solutions/ if it's a pattern worth carrying) without a brainstorm
artifact in the middle.
Conversely, a brainstorm about a multi-actor feature with contested scope and several behavioral conditions probably does need a doc — the planning agent needs the structured content the dialogue produced.
Match depth to content
When a doc IS warranted, depth matches what the dialogue produced. A brainstorm with sparse content produces a sparse doc; one with rich content produces a rich doc. Don't add ceremony to make a slim brainstorm look substantial.
Prose economy
Match-depth-to-content sizes which sections appear and how deep each goes. This sizes how the kept prose reads. A section can be material and still be written loosely — the failure mode is a material section padded into a wall of text where contradictions hide and a downstream agent loses the thread. Length that earns its place is fine; wordiness around that length is not.
Hold every kept section to these:
- Lead with the decision or outcome. Put the conclusion first, then the reason, then background; keep one claim plus its support per paragraph. Don't bury the chosen scope, an open blocker, or a Key Decision beneath its rationale. This does not override section roles — Summary stays proposal-only, Problem Frame stays motivation-only and never restates the remedy.
- One idea per sentence. A Summary is a handful of sentences, not one sentence with five semicolons and four parentheticals. If a sentence needs a second parenthetical to stay true, split it.
- A requirement is one sentence of intent plus at most one qualifier. When a requirement would specify two outcomes ("either A or B, planning decides"), state the intent and send the fork to Outstanding Questions — don't write both arms in full inside the requirement.
- Cut hedges and intensifiers. "Critically", "deliberately", "explicitly", "genuinely", "actually", "simply" carry nothing a downstream agent acts on.
- Prefer the verb to the nominalization. "Demote the grid", not "the demotion of the grid is the deliberate change in this brief".
Precision is not padding: keep IDs, dates, actor names, domain terms, conditionals, and exact thresholds verbatim; when a concrete anchor is knowable from the work already done, use it instead of a vague abstraction. Economy targets the connective tissue around precision, never the precision itself.
Resolve in place; don't stratify. When a later decision answers a parked question or supersedes earlier text, rewrite or remove the original entry — don't append a separate "resolutions" layer that leaves the superseded text standing, and don't keep superseded prose as strikethrough. Version control holds the history. Stacked question/resolution strata double the reading surface and hide which text is live.
Named test, run before the doc is declared written: could a reader find a contradiction in each section in one pass? A sentence carrying more than one parenthetical, or a requirement specifying two outcomes, fails the test — split it or defer it.
Product Contract hard floor
When a requirements-only unified plan is warranted, these are present inside
## Product Contract.
- Summary — what is being proposed, in 1-3 lines. Forward-looking. Orients the reader before they invest in detail.
- Requirements (with stable R-IDs) — what must be true about the proposed thing. For very sparse brainstorms (≤3 simple items where the bullets ARE the summary), plain bullets without IDs are acceptable; the trigger for R-IDs is whether downstream consumers will reference them. When requirements span distinct concerns (e.g., "Packaging" / "Migration and compatibility" / "Contributor workflow"), group them under bold inline headers within the Requirements section — group by capability or concern, not by the order requirements were discussed. The trigger is distinct concerns, not item count — even four requirements benefit if they cover three different topics. Skip grouping only when all requirements are genuinely about the same thing; a long flat list is a smell that subgroups were missed. R-IDs stay continuous across groups (R1, R2 in the first group; R3, R4 in the second; never restart at R1 per group).
Include when material
The agent decides per brainstorm whether each section carries information that isn't covered elsewhere. Filling a section with placeholder prose is worse than omitting it.
-
Problem Frame — include when motivation isn't obvious from Summary alone (the why needs paragraphs, not a sentence). Backward-looking / situational. Does NOT restate the proposal; the remedy lives in Summary.
-
Key Decisions — include when the brainstorm produced opinionated framing choices (defaults, scope narrowings, foundational technical picks) that constrain Requirements / Flows / Scope below. Each entry names the decision in bold with prose rationale. Sits high in the rendered doc so readers encounter the framing choices before descending into detail.
-
Actors — include when the proposed thing has multi-party behavior (multiple humans, agents, or systems meaningfully involved). Skip for non-behavioral brainstorms (naming briefs, data-shape briefs, pure research, decision frameworks).
-
Key Flows — include when the proposed thing has multi-step behavior. Expected by default for behavioral brainstorms unless the proposed thing is genuinely non-flow-shaped (pure API surface, policy, artifact output) and Actors / Requirements / Scope Boundaries / Acceptance Examples together prevent downstream invention of paths. When omitting from a behavioral brainstorm, note the reason in the doc.
-
Visualizations — a brainstorm earns a visual when a concept has a structure worth showing, and that decision turns on whether the structure exists, not on whether your own prose reads clearly. Calling your prose "clear enough" is the trap that quietly under-produces the visuals a reader actually uses — decide on the shape, not the wording. Shapes that warrant one: a data-shape transformation (before/after schema or field mapping), a source-of-truth fan-out (one authority feeding many derived surfaces), state-or-lifecycle logic, a multi-step flow, an entity/relationship structure, a decision boundary, a quantitative comparison — and, for any requirement that changes a UI, screen layout, component placement, or screen flow, a wireframe. This applies to backend and conceptual work, not only visual products: a data model, sync protocol, or agent workflow earns a conceptual diagram exactly as a UI requirement earns a wireframe. Match the visual to the shape — a UI/layout shape takes a wireframe in HTML (a mermaid layout diagram or prose in markdown; there is no inline-SVG wireframe in markdown), any other structure takes a conceptual diagram. A visual is cross-cutting, not a section of its own — it sits next to the Key Decision, Requirements group, or Flow it illustrates. A point with nothing structural to show gets no visual — a single-field add, a rename, or a one-line change has no structure, and a before/after of one changed line is decoration. One visual per load-bearing concept, never decoration or ceremony.
Diagrams complement prose; they never replace it. A diagram is an on-ramp to the prose it illustrates, not a substitute. The IDed prose (Requirements, Key Decisions, Acceptance Examples) stays complete and standalone — a reader who ignores every diagram still gets the full content in text, and a downstream agent that reads the artifact as linear text is never left with a relationship that exists only in an SVG. Adding a before/after diagram is not license to thin the requirement or decision prose it depicts.
-
Acceptance Examples — include when any requirement has a state-dependent or conditional shape ("When X, Y") where prose alone leaves ambiguity about edge cases. Always include AEs covering behavioral-conditional requirements — that's where the ambiguity bites hardest. Skip when all requirements are unconditional and unambiguous.
-
Success Criteria — include when there are quality / metric / handoff signals that Requirements don't already carry: quantitative metrics ("p95 latency under 200ms"), qualitative criteria ("the agent's output reads as one voice"), process / handoff quality ("ce-doc-review can act on this without follow-ups"). Skip when Requirements ARE the success criteria (every R is "done when the R is true").
-
Scope Boundaries — include when scope is contested or there are tempting non-goals worth naming explicitly. When the brainstorm is about positioning a product against adjacent ones the team could have built but is rejecting, split into "Deferred for later" (eventually but not v1) and "Outside this product's identity" (positioning decision). Otherwise, a single list is fine.
-
Dependencies / Assumptions — include when material upstream dependencies exist or when load-bearing assumptions need to be surfaced.
-
Outstanding Questions — include when there are unresolved items. Distinguish "Resolve Before Planning" (blocks planning) from "Deferred to Planning" (answered during planning or codebase exploration).
-
Sources / Research — surface research that orients the planner or justifies framing choices. The test: "if I were the planner reading this cold, would this breadcrumb help me make better choices?" Yes → surface (code locations, external docs, RFCs, constraints, prior plans — the category is inclusive, not enumerated). Process exhaust (reading the user's prompt, glancing at obvious files) → omit.
Agent agency
The catalog is a floor, not a ceiling. When the brainstorm's content doesn't fit any catalog section, introduce a new one — don't force the content into a section it doesn't belong in. Content drives section choices, not vice versa.
The agent also picks per artifact:
- Whether Acceptance Examples render as a separate section or embed in each requirement
- How much depth each present section gets
(Requirements grouping is covered above in the Hard Floor item — group by concern by default, rendering a flat list only when all requirements are about the same thing, with continuous R-IDs across groups.)
Brainstorm metadata fields
Every requirements-only unified plan carries a small set of stable metadata fields that
downstream tooling depends on. The contract is format-independent: in
markdown these fields appear as YAML frontmatter at the top of the file; in
HTML they appear as visible header text (typically a <dl> of <dt>/<dd>
pairs or a stats strip). Field names and semantics are the same across both
formats so consumers can locate them without knowing which format produced the
artifact.
Required
title— the artifact's descriptive name with a- Plansuffix (e.g.,Highlighter Tool - Plan), matching the H1 (markdown) or document<h1>(HTML). It is a unified plan at every readiness state, so the title stays stable whence-planenriches it. Do not put a conventional-commit prefix (feat:/fix:) in the title — thetypefield carries that.type— conventional-commit-prefix-aligned classification (feat,fix,refactor,docs, etc.).date— creation date in ISO 8601 (YYYY-MM-DD), ASCII digits only. Used in the filename (docs/plans/YYYY-MM-DD-NNN-<type>-<topic>-plan.<md|html>).topic— kebab-case slug identifying the brainstorm subject (e.g.,surface-scope-earlier,demo-reel-local-save). Used in the filename and as the resume-detection key whence-brainstormscans for an existing artifact to continue.artifact_contract— alwaysce-unified-plan/v1for new outputs.artifact_readiness— alwaysrequirements-onlyfor newce-brainstormoutputs. Do not useactive,in_progress,completed, ordone.product_contract_source— alwaysce-brainstorm.
No status field
Unified plan artifacts have no status field and no active → completed
lifecycle. artifact_readiness is document completeness, not execution
progress. No CE artifact carries mutable progress state; whether work shipped
is derived from git, not stored in the doc. Do not introduce one.
Field-name stability
Field names are stable across brainstorm revisions — never rename a field
or repurpose its semantics. Agents composing new brainstorms MUST use these
exact names; adding new fields is fine, but renaming topic to subject
or date to created breaks filename construction and resume detection.
ID and content rules
Same shape as plan rules.
- Stable IDs. R-IDs (Requirements), A-IDs (if Actors fire), F-IDs (if Flows fire), AE-IDs (if Acceptance Examples fire). No other ID namespaces.
- Plain prefix.
R1.,A1.,F1.,AE1.as bullet prefixes. Do not bold; the prefix is visually distinctive on its own. - Bold leader labels inside Flows and Acceptance Examples
(
**Trigger:**,**Covers R4, R8.**) provide structure without deeper heading levels. - Repo-relative paths. Always. Never absolute paths.
- No process exhaust. No "captured at Phase X" notes, no
## Next Stepspointing to ce-plan, no italic provenance lines. Engineering process metadata belongs in commit messages and tool output, not the artifact. - No implementation details by default. Libraries, schemas, endpoints, file layouts, code structure stay out unless the brainstorm itself is inherently about a technical or architectural change and those details are the subject of the decision.
Discipline: Summary vs Problem Frame
When both sections are present, they earn separate sections only by holding to different purposes:
| Section | Question it answers | Time direction | Length |
|---|---|---|---|
## Summary |
What is this doc proposing? | Forward-looking | 1-3 lines |
## Problem Frame |
Why does this proposal exist? | Backward-looking / situational | Paragraphs |
- Summary doesn't need problem context. A reader scanning Summary gets the proposal at a glance.
- Problem Frame doesn't restate the proposal. It establishes the situation, the specific moment of pain, and the cost shape — then stops. The remedy lives in Summary; restating it in Problem Frame is the duplication that makes the two sections feel redundant.
Rendering
The format-specific references describe how to render these sections in each output format:
- Markdown rendering:
references/markdown-rendering.md - HTML rendering:
references/html-rendering.md
This reference (brainstorm-sections.md) is about WHAT the brainstorm
contains; rendering references are about HOW each format presents it. The
brainstorm is written in one format — markdown OR HTML, never both — based
on the resolved output mode. The section catalog is the same regardless of
format.